Lane closure scheduled as part of Wekiva Parkway construction

1642

The inside left-turn lane northbound of S.R. 429 to Connector Road will close for bridge work as part of the Wekiva Parkway construction.

The closure will happen on Thursday, May 4 from 8 p.m. to 6 a.m. so crews can pour concrete bridge deck.

Flaggers will direct traffic, and electronic message boards are posted to alert drivers. Bad weather or other unforeseen circumstances could delay or prolong work. Motorists are urged to use caution in the construction area for their safety and that of the work crews.

This work is part of the Central Florida Expressway Authority’s $56 million project to build the Wekiva Parkway from where the S.R. 429 currently ends at the Connector Road to just north of Ponkan Road. This section is scheduled to open to traffic this summer.

This project is among five parkway sections being built by CFX, totaling 10 miles and more than $271 million in construction costs. Once completed, the 25-mile parkway will complete Central Florida’s beltway, while helping to protect the natural resources surrounding the Wekiva River.

The Apopka Chief and The Planter are weekly community newspapers, independently owned and family operated, which have served the greater Apopka area in Central Florida since 1923 and 1965 respectively. The Apopka Chief is available every Friday, and The Planter, every Thursday.